The early diesel locomotives were big, heavy and under-powered compared to the steam locomotives they replaced. The 3300hp Deltic (above) was one of the early challengers with sufficient muscle for the task. But this power was dearly bought. A typical diesel-electric locomotive cost about five times as much as the equivalent steam locomotive, and machines like the Deltic were highly tuned, needing a well planned support operation with teams of skilled technicians to keep them going day in and day out. The days of muck shovelling by unskilled labour were over.
What was the early experience with diesels? It was claimed that they could keep running 22 hours a day, and the better designs probably could. The difficulty was, and is, that there is not the traffic to keep them occupied in this way, and once complete fleets had been acquired, expensive capital was inevitably kept idle for long periods. This is the economic reality of running a railway. Demand varies over the course of a day, a week, a year, and over the longer economic cycle. Railway equipment can spend long periods out of use over the course of its life of thirty or forty years.
This is why yield management needs to be applied to both short-term and long-term cycles. One solution is to keep a mix of new and old, using the efficient new stock all the time and bringing out the less efficient old fleet to cope with peak demands.
2 Feb 2010
Theory and practice are two different things - part 1
The writer C P Snow famously said that an unbridgeable gap had developed between the arts and the sciences, and the mark of the scientist was that he (and it usually was a "he" when he made his comment, in the late 1950s) could explain the Second Law of Thermodynamics. This was part of the physics syllabus and was usually and confusingly explained with diagrams like the one on the left. The simplest way of putting it is to say that heat does not flow of its own accord from a cold object to a hot one, which everyone knows.
When the Law is applied to applied to engines which work through the expansion of a hot gas, it turns out that they are more efficient if the gas starts off as hot as possible and is cooled to the lowest possible temperature. Steam locomotive engineers knew about this early on but it was not always easy to put into practice. The boiling point of water increases with pressure and progress consisted of running boilers at higher pressures - which was dependent on the state of contemporary metallurgy. Superheating, which involves sending the steam back through extra banks of tubes into the fire, led to a dramatic increase in efficiency but did not become widespread until quite late in the history of the steam locomotive. The delay was due to the lack of suitable lubricants which were not carbonised by the hot steam. Compounding was another device meant to improve efficiency, the steam being allowed to expand in successive stages in two or more sets of cylinders or turbines. Condensing the steam back to water is another way to increase thermal efficiency, and although it was usual on ships and always applied in power stations, it was only used on steam locomotives in special circumstances.
But these efficiency improvements came at a price, since they added complexity and cost, and could come at the expense of reliability. It was also essential that the engineer knew what he was doing, which was not always the case.
Steam engines are not obsolete, since most electricity is generated using steam power, but what is practicable in a fixed power station is not always so in a mobile unit, and the overall efficiency of the average steam locomotive was less than 10%, compared to perhaps 50% in a power station.
However, because the power of an internal combustion engine depends on the speed at which it is running, and great forces must be exerted to start a load as heavy as a railway train, complex and expensive electrical or mechanical transmission systems are needed. Steam traction remained dominant on railways worldwide until the 1960s, despite its thermal inefficiency and the added disadvantage that the coal fuel normally used was dirty and difficult to handle.
When the Law is applied to applied to engines which work through the expansion of a hot gas, it turns out that they are more efficient if the gas starts off as hot as possible and is cooled to the lowest possible temperature. Steam locomotive engineers knew about this early on but it was not always easy to put into practice. The boiling point of water increases with pressure and progress consisted of running boilers at higher pressures - which was dependent on the state of contemporary metallurgy. Superheating, which involves sending the steam back through extra banks of tubes into the fire, led to a dramatic increase in efficiency but did not become widespread until quite late in the history of the steam locomotive. The delay was due to the lack of suitable lubricants which were not carbonised by the hot steam. Compounding was another device meant to improve efficiency, the steam being allowed to expand in successive stages in two or more sets of cylinders or turbines. Condensing the steam back to water is another way to increase thermal efficiency, and although it was usual on ships and always applied in power stations, it was only used on steam locomotives in special circumstances.
But these efficiency improvements came at a price, since they added complexity and cost, and could come at the expense of reliability. It was also essential that the engineer knew what he was doing, which was not always the case.
Steam engines are not obsolete, since most electricity is generated using steam power, but what is practicable in a fixed power station is not always so in a mobile unit, and the overall efficiency of the average steam locomotive was less than 10%, compared to perhaps 50% in a power station.
Internal combustion arrives
Internal combustion engines are inherently more efficient, since the hot gas is produced in the cylinders or turbines themselves by burning a mixture of fuel and air. In most circumstances the hot gas is hotter than the hottest steam can be, and the machine is bound to be more efficient, in accordance with the theory. Stationary engines using ordinary town gas had become quite common at the end of the nineteenth century, and then liquid hydrocarbon fuels made it possible to build small and power engines capable of driving road and rail vehicles and aircraft.However, because the power of an internal combustion engine depends on the speed at which it is running, and great forces must be exerted to start a load as heavy as a railway train, complex and expensive electrical or mechanical transmission systems are needed. Steam traction remained dominant on railways worldwide until the 1960s, despite its thermal inefficiency and the added disadvantage that the coal fuel normally used was dirty and difficult to handle.
1 Feb 2010
Penetrability - tramways in Gothenberg
1, 2, 3 Brunnsparken; 4, 5 Masthugget; 6 Vasagatan; 7 Hjällbo; 8 Saltholmen; 9 Bergsjön; 10 Chalmers Tunnel; 11 Brunnsparken
The Gothenberg system as it is today is not what was planned. The long extensions to the suburbs were intended as part of a metro system in which the street tramways would run underground in the city centre. But cutbacks became necessary and the trams still run in the streets. This retains the connectivity than would have been lost if the trams had been put underground.
Another unintentional feature is the continuing use of vehicles dating from the 1960s which have just been refurbished for another ten years of service. This was due to the initial unreliability of the replacement five-section trams (bottom), the order from Ansaldo having been curtailed due to the prolonged teething troubles.
Political interference leads to waste
Warship Class D840 Resistance on the scrapline at Old Oak Common 1 Nov 1969, originally uploaded by JohnGreyTurner.
When the war ended, new and improved designs of steam locomotives were introduced, which more efficient and incorporated a collection of labour-saving features. Then came nationalisation in 1948 and further design improvements were made by British Railways' engineering design team. By the early 1950s, diesel traction was becoming established in the USA, and a handful of expermental locomotives came into service in Britain. Then, in 1951, a Conservative government was elected and Britain's railways were reorganised and decentralised. And in 1955, a Modernisation Plan was announced, proposing a major programme of electrification, the introduction of diesel multiple unit trains for local services, a pilot scheme of main line diesels, with the purchase of about 200 locomotives. The construction of steam locomotives would continue for a few more years and it was expected that these would run until they wore out, which would have kept them going until the mid-1980s.
So far so good. The details are not clear even now, but it seems that the government bent to pressure from industry and a decision was made to eliminate steam as soon as possible. This meant large orders for the manufacturers. The effect was that designs that were intended as prototypes went into large-scale production without sufficient testing. Some designs worked well, others needed substantial and expensive modifications before they would run reliably, and a few were endlessly troublesome and quickly went for scrap. The last steam locomotive was built as late as 1960, but the entire fleet had been retired by 1968, many running for less than half a dozen years. By then, the railways had a collection of odds-and-ends which were not necessarily faulty but were non-standard, such as the diesel-hydraulic locomotives seen in the picture. They too, went for scrap after just a few years in service.
It was a episode of waste, caused mostly by political interference. In West Germany, by contrast, steam continued in service for another decade as modern equipment was kept in use for as long as it was economic.
Penetrability
One of the claimed advantages of rail over air travel is that it runs city-centre to city-centre. But most journeys are not of this nature. Most people live around cities rather than in the middle of them and at least one end of their journey involves a connecting stage of some sort. It is most likely to be made in a car. Having got into the car, the temptation is to make the whole journey in the car. It is not just a matter of time but of convenience. High speed rail does little to make the car less appealing in comparison, especially when it is expensive unless bookings are made well in advance.
What would tip the balance in favour of the train? One factor is penetrability. The convenience of the local transport network is critical. It means frequent services that go as close as possible to where people want to travel to where they live and work. Buses are obviously an essential part of the mix, but it must also include trams, light rail (above) and local train services. It may also mean that long distance trains should stop more frequently, with well-located stations on the edge of conurbations. It is to satisfy this kind of developing need that the Great Western main line has evolved into a sort of long-distance metro service, where little sustained high-speed running is called for.
If this is the future, then high speed rail begins to look like an irrelevancy that will suck resources away from where they are most needed.
Yield management
Railways have enormous fixed costs which must be paid before even one single passenger can travel. The line, stations, signalling equipment must be constructed. Rolling stock must be obtained. Staff must be engaged, trained and their wages paid. It adds up to a lot of resources invested, and the aim must be to achieve the best use of these. Resources fall broadly into three categories: the fixed infrastructure, the rolling stock and the trains service itself.
Little extra cost is incurred in running one additional train, so long as the capacity of the track and signalling is not strained to the point that congestion occurs. Likewise, little extra cost is incurred in running longer trains rather than shorter ones, so long as the rolling stock is available. And it costs no more to run a full train than an empty one.
From the operator’s point of view, the simplest and most efficient operation is to run standard fixed-formation trains at regular intervals, on infrastructure with just enough spare capacity to enable the system to recover from disruption. The snag is that the resulting service is not one that provides the trains when people prefer to travel. Some means must be found to adjust demand to supply. This is where the concept of “yield management” comes in.
Although the railways have always practised some form of yield management, originally with offers such as cheap excursions and off-peak reductions, the concept was developed by the airlines and based on a flexible pricing arrangement that ties passengers to particular flights, thereby committing them to travel arrangements made long in advance. This also enables the airline to make fine adjustments to avoid running almost-empty aircraft. Although railways are unable to tune the service so precisely, they have in recent years adopted much the same system, with very high prices being charged for so-called “open tickets”. Although it may mean that some fares are lower than they might otherwise be, this is not attractive to passengers. Everyone will at some time have bought a ticket, found themselves unable to travel, and ended up wasting their money. After this has happened a few times, if not sooner, they are likely to conclude that it suits them better to leave the decision to travel until the last moment and hop into the car parked outside the front door.
The assumption behind this kind of yield management is that resources are best utilised by using the price mechanism to match demand to supply. But behind that is another assumption, that the most efficient way to run a railway is to fix the supply. Is it?
Smart yield management
If the electricity supply industry worked in the same way, it would provide just enough capacity to cover the base load and then drive demand down through charging draconian prices during the peak. Many people would be forced to sit in the dark, huddled up with a candle, or collect firewood. Instead, the generating companies rely on a mix of sources: nuclear power for the base load, coal-fired power stations for seasonal demand and gas generation to cater for peak demand in the course of the day. The general principle is that the cheapest electricity requires the most capital investment and vice versa, and with this in mind, it is possible to fine-tune the supply, with a simple tariff made up of a fixed charge, and standard and off-peak rates for the electricity consumed. This is a smart form of yield management.For the first 150 years of railways, yield management was practised in much the same way. Old and less-efficient rolling stock, which had long since been bought and paid for, was kept in reserve and brought out to handle peak traffic.
A common practice was to run fixed-formation trains most of the time but to add extra vehicles when extra traffic was expected, which an experienced operator can easily predict. A train such as the London to Glasgow express, the Royal Scot, was normally 14 carriages long but up to three more might be added at busy times. This was often done at short notice, up to a few minutes before the train was due to leave. Extra trains were also run, usually scheduled in peak holiday timetables but sometimes laid on, again at short notice, using free “paths” that were left when timetables were constructed. These extra carriages, and the stock for these additional trains, were usually drawn from the pool of older vehicles that was retained just for that purpose.
Another strategy was to use trains used by commuters during the week to take people to popular leisure destinations at the weekend. The size of the fleet itself could also be adjusted, to match seasonal demand by, for example, repairing freight locomotives and wagons in the summer and passenger stock in the winter.
The facility of being able to run extra trains and use extra carriages did not come free of charge, they had to be kept on standby, the track layout had to be suitable, and shunting locomotives had to be kept available to move things around. And flexible staffing arrangements were needed to make the whole thing work. But this was nevertheless yield management, as revenue was being earned from resources which would otherwise have gone for scrap. The old-time railway managers knew what their were doing. It might be termed “smart yield management”.
Mix & Match no more
The kind of flexibility that the old-time railway managers enjoyed was dependent, amongst other things, on certain technical decisions. Fixed formation trains are a new phenomenon and must be distinguished from multiple-unit electric and diesel trains which are joined and separated as the service requires. Anyone who has had the use of a train set will know that one of the most important features of trains is that vehicles can be added or removed at will. It is only possible, however, if everything on the railway has a standard interface for the buffing, coupling, braking, heating and electrical systems. Hornby and Trix didn’t mix. On the full-size railway, it used to be that all stock was compatible with all other stock. Trains could be made up of carriages old and new, belonging to several different companies, and pulled by a locomotive belonging to yet another. The same applied even to international trains. At important junctions such as Basle, it was usual to see trains composed of a selection of carriages from all over Europe: Germany, France, Italy, Belgium, the Netherlands and Denmark.Around forty years ago there was a change in thinking, which brought trains such as the British Inter City 125, having a lightweight locomotive at each end and a fixed set of carriages in between, which could be changed only with difficulty. At around the same time, rolling stock become more complex and also hugely expensive, partly to cope with the demanding conditions of higher speed running. Complexity eventually multiplied itself to the point that some fixed formation trains have essential equipment in each one of the vehicles and so are unable to run unless they are complete. A further difficulty is that vehicles not specifically designed to run in the train cannot be added without expensive modifications, if at all. A Voyager cannot be lengthened just by inserting a standard Mark 3 coach. If the need for extra vehicles arises, as happened with the Pendolino, the entire production line must be started up again, which is a costly and difficult thing to do. The entire contemporary railway operation is conducted with rolling stock resources squeezed to the limit.
The underlying design principles result in built-in inflexibility. It works directly against a philosophy of smart yield management which would optimise the railway system and its resources as a whole and provide the service which best matched supply to demand.
More thoughts on dirt-cheap train fares
Having been doing some travelling lately, I have had more thoughts on the subject of ultra-low train ticket offers. When I first started travelling long distance in the early 1950s, the return fare from London to Glasgow was £5 0s 6d. This was calculated at 1½ d a mile (hence the odd sixpence), and all fares were at the same rate, according only to the distance. There were of course cheap day returns and special excursion trains to popular destinations, which were a simple form of yield management, since they made use of rolling stock which would otherwise have been standing idle or gone for scrap. Later in the 1950s came the mid-week return, available on Tuesdays, Wednesdays and Thursdays, with the aim of tempting people onto under-used services and relieving the pressure on the busier trains.
Nowadays, things have gone to opposite extremes as the railways have followed the airlines. At one time, this meant cheap standby fares for passengers who turned up at the last minute, but the present fashion is exactly the opposite, with super-cheap offers for those who book months in advance. Swedish Railways, for instance advertise a fare of 95 kronor (just over £10) for long distance routes such as Gothenberg to Copenhagen. The inter-city train companies do a similar thing in the UK.
But just you try and get hold of one when you actually want to travel. The Swedish offers apparently attracted the attention of professional ticket touts who then re-sold the tickets on Ebay. Failing to get the message, the nationalised train company compounded the problem by insisting that passengers proved their identity when they travelled. Which has not, it seems, made the tickets any more available.
What, then, is the point? When passengers repeatedly fail to buy train tickets at these widely advertised rock-bottom prices even when they try to book several weeks in advance, they draw the conclusion that the offers are nothing more than a marketing gimmick and end up feeling swindled or worse. This cannot be good for the image of the train operator, who loses money, as there can be few people who are induced to travel who would not have made the journey anyway.
There is nothing wrong with yield management, but this needs to take place intelligently and at several levels. Railways have enormous fixed costs which must be paid before even one single passenger can travel. The line, stations, signalling equipment must be constructed. Rolling stock must be obtained. Staff must be engaged and trained. It adds up to a lot of resources invested, and the aim must be to achieve the best use of these.
The implications are that little extra cost is incurred in running one additional train, so long as the capacity of the track and signalling is not strained to the point that congestion occurs. Likewise, little extra cost is incurred in running longer trains rather than shorter ones, so long as the rolling stock is available. And of course it costs no more to run a full train than an empty one.
From the operator’s point of view, the easiest way to run the service is to have fixed-formation trains at regular intervals, on infrastructure with just enough spare capacity to enable the system to recover from disruption. The snag is that the resulting service is not one that provides the trains at the times people prefer to travel. Some means then must be found to adjust demand to supply. Whether this is the most efficient way to use resources is questionable, but it spelled the end of the simple mileage-based fares of the past. It does not, however, explain the rise of the bargain-basement fare, which probably grounded on nothing more than the desire for good advertising copy.
Nowadays, things have gone to opposite extremes as the railways have followed the airlines. At one time, this meant cheap standby fares for passengers who turned up at the last minute, but the present fashion is exactly the opposite, with super-cheap offers for those who book months in advance. Swedish Railways, for instance advertise a fare of 95 kronor (just over £10) for long distance routes such as Gothenberg to Copenhagen. The inter-city train companies do a similar thing in the UK.
But just you try and get hold of one when you actually want to travel. The Swedish offers apparently attracted the attention of professional ticket touts who then re-sold the tickets on Ebay. Failing to get the message, the nationalised train company compounded the problem by insisting that passengers proved their identity when they travelled. Which has not, it seems, made the tickets any more available.
What, then, is the point? When passengers repeatedly fail to buy train tickets at these widely advertised rock-bottom prices even when they try to book several weeks in advance, they draw the conclusion that the offers are nothing more than a marketing gimmick and end up feeling swindled or worse. This cannot be good for the image of the train operator, who loses money, as there can be few people who are induced to travel who would not have made the journey anyway.
There is nothing wrong with yield management, but this needs to take place intelligently and at several levels. Railways have enormous fixed costs which must be paid before even one single passenger can travel. The line, stations, signalling equipment must be constructed. Rolling stock must be obtained. Staff must be engaged and trained. It adds up to a lot of resources invested, and the aim must be to achieve the best use of these.
The implications are that little extra cost is incurred in running one additional train, so long as the capacity of the track and signalling is not strained to the point that congestion occurs. Likewise, little extra cost is incurred in running longer trains rather than shorter ones, so long as the rolling stock is available. And of course it costs no more to run a full train than an empty one.
From the operator’s point of view, the easiest way to run the service is to have fixed-formation trains at regular intervals, on infrastructure with just enough spare capacity to enable the system to recover from disruption. The snag is that the resulting service is not one that provides the trains at the times people prefer to travel. Some means then must be found to adjust demand to supply. Whether this is the most efficient way to use resources is questionable, but it spelled the end of the simple mileage-based fares of the past. It does not, however, explain the rise of the bargain-basement fare, which probably grounded on nothing more than the desire for good advertising copy.