7 Apr 2010

Double-stack containers


03_23_5, originally uploaded by tarunhuria.

If there is to be any new railway construction in the UK, shouldn't the lines be designed to accommodate double-stack containers like this on Indian Railways?

It will of course take time before even a useful basic network is established but one has to start somewhere. A worthwhile initial aim would be to develop routes from Felixtowe and Southampton to the Midlands.

6 Apr 2010

Seat reservations

Seat reservations are popular with train companies, but less so with passengers. Research by Transport Watch has revealed that many passengers do not sit in the seat that they reserved. A glance down any carriage will reveal that many of the reserved seats have not been claimed.

If one travels on a long journey, for example, from Cologne to Hamburg, it is like a game of musical chairs as passengers move from one place to another.

There are probably two main reasons why people swap seats. They may not like the look of their neighbouring passengers - a broadcaster on "Thought for the Day" once said that passengers always walked past his compartment if he was wearing his clergyman's collar!

And there is the design of the rolling stock. People prefer a seat with a view out of the train even if they spend most of the journey watching a film on their laptop computer, but in many types of rolling stock introduced since the 1970s, windows and seats are misaligned and the view out is obstructed. This problem has been aggravated by the prevalence of airline-style seating, which also gives rise to a luggage problem. On aircraft there there is secure storage for large items of luggage. On trains, people prefer to have their luggage nearby, and when seats are arranged in facing bays there is space between the seat backs. But when the seats are arranged airline style, the luggage space is lost and space has to be provided somewhere else, usually near the doorway where anyone can walk off with it.

One answer is to reserve a place on the train rather than a particular seat. Another is to provide seating plans so that passengers can choose where they sit, as in the example above from Sweden which can be downloaded from the train company's web site. The real solution, however, is to arrange the vehicle interiors much like the original Danish IC3 stock, which ensures that most people will be satisfied, wherever they sit.

29 Mar 2010

Double-deck trains

Double-deck trains are widespread in continental Europe. The best of them are in Finland, where the railways are to the Russian gauge and vehicles much larger than everywhere else. The upper deck lacks the usual uncomfortable curved windows found on double-deck trains and there is a proper luggage shelf above. (photograph)

The only real problem is that there is a shortage of space for large cases, which have to be dragged up the stairs. There are lockable luggage lockers but these will not hold a large case.

The benefits of double-deck trains are marginal, due to the space occupied by the staircases. Much time is taken loading and unloading at stations. These are also quite heavy vehicles with an axle-load of 12.5 tons, which is a lot for a trailer, compared with the 9 ton axle-load of a mark 3.

If we are expecting to have double-deck trains in the future, this must be planned for at the outset. The railway must be constructed to a larger loading gauge than the present continental standard, as we should not be constrained to having vehicles with low curved ceilings.

Thoughts on passenger vehicle design

This piece discusses general aspects of passenger vehicle design. There are several interacting parameters which need to be considered together.

The first of these is what is known as the static loading gauge. This can be thought of as the aperture through which all railway vehicles must be able to pass when running slowly on straight track. In practice, tracks are curved and railway vehicles cut across and project beyond the chord of a circle. Within the wheelbase, the distance cut across the curve is sometimes known as the overthrow and the projection beyond the wheelbase is referred to as the kick-out. A long vehicle cuts off more of a chord than a short one (diagram below) Taking curvature into consideration in this way leads to the concept of the dynamic loading gauge, which, however, also takes account of the suspension characteristics of the vehicle.

The diagram shows how gaps between the platform and the train will arise differently at concave and convex platform faces, and that these gaps can be minimised by keeping doorways as close as possible to bogie centres.

Chords colour

Following the nationalisation of Britain's railways in 1948, a survey of the infrastructure was made and an optimum loading gauge established for passenger vehicles. This was known as the C1 loading gauge and eventually it became possible for vehicles built to this gauge to operate over almost the entire system. The C1 loading gauge applied to vehicles of a nominal 20 metre width with bogies at 14.174 metre centres, of which the first were the Mark 1 fleet.

Mark 1 interior

These (above) were characterised by curved bodysides with the width reducing to cantrail level (where the roof joins the bodyside)

Vehicles to a similar length are still being built, but all of them have two pairs of bi-parting doors at the 1:3/2:3 position. (below)

First Capital Connect

This divides the vehicle into three saloons, one of four bays in the middle and two of two bays at each end. This is not a particularly satisfactory arrangement. If the vehicle is a monocoque construction, then the large door apertures break into the structure at the worst possible place from the point of view of integrity. Substantial reinforcement is then required around these openings.

The division into three saloons also imposes limitations on the alternative seat layouts that can be accommodated, because the small end compartments can only be used for four rows of seats (or three and a driver's cab) or some special purposes such as a wheelchair and toilet area. The third drawback is that having just two sets of doors per vehicle leads to passengers bunching round doors at stations, which extends station dwell times. The fourth drawback is that it would be inconvenient to fit internal vestibule doors, so that passengers sitting inside are exposed to cold air in the winter when the doors are open, and there is a heavy load on the heating and ventilation system during hot and cold weather.

What are the alternatives? 20 metre long vehicles are used for two types of service. One is for long distance commuting, for example, South Coast inter city. For such routes, an end-door configuration would be more suitable, provided that attention was paid to the detailed design of the doorway and the space immediately inside, with sufficient vestibule and circulation space for passengers to move down inside the car. Otherwise, station dwell times will be too long.

Train diagram

The diagram shows a ten bay vehicle, of which the two end bays are vestibules with wide doorways. It would have internal doors between vestibule and saloon, with the aim of improving passenger comfort and reducing the work required of the heating and ventilation system. Such a configuration would not be suitable for rush hour congestion. An alternative with four single doors would be. Having four doors instead of the standard 1:3/2:3 double-door configuration ought to reduce station dwell time. This is shown below. Each vestibule would occupy a full bay and be provided with space for luggage and perch-type seating. Such a train would be suitable for the inner sections of Thameslink and probably Crossrail also, provided that stations do not have sharply curved platforms.

Train diagram

If higher traffic densities are to be handled, then trains need to have either three or more sets of double doors or two sets of double doors and single doorways at each end, the standard on tube LUL stock.

Inter city vehicles
Finally, there is the matter of longer inter city vehicles. Due to the overthrow on curves, the width of a vehicle longer than 20 metres must be reduced by an amount proportional to the square of the distance between bogie centres. This is based on the formula x squared equals h*(d-h), where x is half the length of a chord and d is the diameter. h is the distance cut off by the chord. (diagram below)

Chords1

A vehicle 20 metres long can be built to the full permitted width of 2.82 metres. Longer vehicles were introduced in the 1970s, with the mark 3 design. Based on a track curvature of 200 metres, a 23 metre vehicle must be 8 cm narrower (2.74), which is the same width as a mark 1 vehicle due to the projection of door handles etc on the 1940s-designed stock. However, a vehicle of intermediate length could be built to a width of 2.79 metres, losing just 3 cm from the maximum permitted width, whilst gaining an extra bay compared with a mark 1 coach.

The photographs at the bottom, which shows the Swedish X2000 tilting train with stainless corrugated bodyshell, and the Alstom Adelante, give an idea of what is envisaged. Such vehicles are an appropriate choice for locomotive hauled or electric multiple unit inter-city trains, such as we are likely to see now that the IEP project is abandoned.

Stainless steel bodyshells (below, lower) would be worth considering on account of their extreme long life and low maintenance requirements.

Adelante train interior

Swedish X2000 train

Wheelchair access and more...

Wheelchair access toilets have to date not been particularly well integrated into the vehicle interior layout. One issue is that the size of the module does not fit with a centre aisle seating layout. Another is that there is a need to provide access to toilets from the entrance vestibule rather than from the passenger saloon to prevent annoyance from bad odours. With this in mind, it is worth considering if wheelchair access toilets should not be associated with other facilities which require an off-centre gangway, such as catering areas, first class compartments and luggage/cycle areas. It would also be worth considering whether toilets should be provided in every vehicle. It might be advantageous to concentrate toilet facilities in fewer vehicles, to avoid the need for plumbing in every coach; this may create the opportunity to offer additional facilities such as showers for passengers' use.

27 Mar 2010

The Irish Mark 3 fleet


Experimental train 1986, originally uploaded by seadipper.

There is now discussion in the railway press about returning the redundant Irish mark 3 stock to Britain. This could add up to 130 vehicles to the fleet, including the magnificent large-windowed International set. (above)

The problems, apparently, are that they have a different electrical system and the bogies need to be modified or changed for the different gauge, but with new vehicles costing upwards of £2.5 million, they suddenly look like a bargain.

So what exactly is the economic benefit?

I have had a good look at Fast Forward (link on right) with this question in mind. It suggests that the economic benefit is about three times the construction costs. This is consistent with Transport for London's findings for the Jubilee Line Extension, which revealed an increase in land values alone of about three times the cost of building the line.

Businesses remote from the capital ought to benefit from the shorter journey times, as it becomes easier to attend meetings where people are coming from different parts of the country. There is, however, no reason to assume that the benefits will occur in the places remote from London rather than lead to increasing concentration in the capital; places such as Reading and Brighton have flourished with improved transport, but they have become essentially suburban nodes rather than centres in their own right. High speed rail could merely accentuate that trend.

Fast Forward says this about the benefits of a national HSR network

The direct benefits of the national high-speed rail network lead to enhanced productivity and greater economic efficiency. These effects are measured, following appraisal techniques that have been used for many years, in terms of:

  • Journey time savings for passengers who have transferred from other modes, in this case private car, air or classic rail services. This is the largest single category of benefit and highlights the economic value of speeding up travel times. The forecasts include an estimate of the benefit of greater punctuality as well as planned shortening of journey times;
  • Reductions in crowding on the rail network from the increased capacity provided – there are benefits to passengers using the HSR services and to those using classic rail services;
  • Benefits from capacity released with an expanded set of local and regional rail services on the existing network;
  • Benefits for railfreight also secured generally by freeing up capacity on routes that will otherwise be constrained and unable to accommodate growth in rail freight;
  • Less road congestion – 13 million car trips are removed from the road network in 2055;
  • Reductions in carbon emissions – estimated to total one million tonnes per annum, arising in part from the shift from air to rail, which is forecast to result in a reduction of 30 million air passenger trips by 2055. The shift from car to rail will also reduce carbon emissions.
In addition to these ‘conventional’ benefits incorporated in the cost benefit figures presented in this chapter, the wider economic impacts have been estimated – these take into account the effects of changes in accessibility which can have a further beneficial effect on the productivity of businesses through changes in employment patterns and agglomeration effects. These wider impacts are estimated to add 13% or £14 billion to the transport benefits estimated in the conventional cost-benefit analysis below.

These wider economic benefits are well distributed across the regions: 36% to the Midlands and the North of England, 35% to the wider South East including London, and 26% to Scotland.

There will also be a significant number of jobs created for the construction and operation of a HSR network, although we have not yet attempted to quantify this effect. The increased economic activity will also provide new tax revenues to HM Treasury.

Agglomeration
The report talks about "Agglomeration Effects" due to improved transport. It says
The methodology for calculating these ‘agglomeration’ effects is relatively new. The estimates presented here follow current DfT guidance. But it may be that there are other wider effects that arise from what is, after all, a fundamental change to the national transport system – and one for which most of these appraisal tools are not designed to measure. In particular, if HSR leads to a substantial change in land use, and in the development pattern of the cities across the nation, then there could be very substantially greater wider economic impacts. There are just no agreed means to assess such effects at present."

This inability to quantify the benefits is worrying, because it makes it difficult to assess the relative advantages of alternative projects. Nevertheless, the document makes a reasonable case for some kind of entirely new railway construction. Unfortunately, it takes as a given the assumption that this new railway construction should be for high speed services.

Throughout the discussion on the subject, it appears that the relative costs of both construction and operation have been understated in favour of high speed rail. Existing alignments cannot be used for high speed operation because of the much higher minimum radius curves that are possible, which restricts the choice of route. And other things being equal, energy costs are always going to be much higher for a high speed railway, even if aerodynamic factors are optimised. Existing rolling stock cannot be used - an important consideration, since there a significant proportion of the fleet is halfway through a service life which, because it is in better condition than previously thought, is now recognised to be sixty years rather than than the thirty years that was previously assumed.

The journey time savings that might be achieved by high speed rail between say, London and Newcastle, are indeed worthwhile. But most long-distance journeys are shorter and the time savings are relatively less valuable. The real advantages that Fast Forward has identified have more to do with increased capacity than time savings. Before more resources are invested in this project, a study needs to be done of the costs and benefits of constructing an alternative supplementary 125 mph network.

Well done Southern!

Last night the through Gatwick Express to Brighton was cancelled due to a fault in the class 442 unit that normally run the service.

A class 460 unit was drafted in, which terminated at Gatwick, where a 4-car unit for Brighton was waiting at the far end of the same platform. Passengers were told to transfer and the train left as soon as people were ready, arriving at Brighton only ten minutes late.

It was all painless and a model of good operating. That's the way to do it. But this is only possible if there is some slack in the system to enable the operators to respond when things go wrong.