14 May 2010
Class 313 trains transferred to Coastway services
The class 313 suburban trains introduced in the mid 1970s were never the most wonderful of trains. They have been running around in the London area for far too long, but have finally been replaced as London Overground has taken over the routes and introduced new trains.
Now these badly designed trains have been sent to plague passengers on routes along the south coast. To be fair, Southern has got a problem as there is little else available that is suitable, and it has done them up as best it can. New seats are being fitted, one hopes not in the original configuration which is very cramped and gives nobody an unobstructed view out of the train - this is not necessary.
They have no air conditioning, but nor do they have the anti-draught sliding ventilators fitted to the mark 1 stock, and so the windows cannot be opened without causing a draught down the whole length of the carriage. The trains have no toilets and neither do most of the stations any more. This is not good enough, especially when it is apparently intended to use them on the Brighton to Portsmouth run, which takes about 90 minutes. The last time trains without toilets were used on this route was about 1950 and in those days there were toilets on all the stations.
There is also going to be a problem at one of the sharply curved platforms at Lewes. The doors one these trains are closer to the centre of the vehicle than they are on the present Electrostars and there will be an even wider gap between between the platform and the train.
Anticipating an unfavourable reception, Southern has printed leaflets and staged "meet the manager" events locally. Passengers are going to vote with their feet, especially when one must allow 15 minutes at Brighton to get a ticket from the badly designed machines. Over-60s will decide that if they are going to travel in discomfort without access to a toilet, they might as sell go by bus for nothing.
A lot of people will be wishing the slam door stock hadn't been scrapped.
Here is what Southern have to say...
I am sorry that you are not looking forward to the introduction of the Class 313 trains.
We are spending six million pounds refreshing the trains so that they are an improvement on what they were. This refresh will include redesigning the seats so that they are more comfortable and facing each other, meaning that window views will not be obstructed. This will create more room in the aisles.
With regards to the lack of toilets of the 313s, they were not designed to have toilets on board and, in order to provide more space for passengers, they will not be installed. Whilst we are aware that toilet facilities are important, our research shows that the majority of passengers will be making short journeys. We are also working on ensuring that all stations along the line have toilets so that passengers can disembark if necessary.
If you have any further queries about the 313 trains, please feel free to ask a member of staff at our stations or contact us again.
Frankly I think Southern is one of the better train companies and you can't really fault them. Their difficulty is that Britain has a legacy of poorly designed old rolling stock, new rolling stock which can be temperamental, and regulatory requirements which appear to be why they don't seem to be able to solve the ticket machine problem.
5 May 2010
Ticket Machines
Brighton Station ticket queue, originally uploaded by seadipper.
I have complained endlessly about Southern's so-called Fasticket machines since they were introduced in a hasty system-wide rollout in 2005. Nothing fundamental has been done to address the problems. They are cumbersome with a poor and non-intuitive program flow, a poor interface and a lack of reliability, especially the on-screen keyboard which passengers must use if they are not going to the most popular dozen or so destinations. The touch screens are either over-sensitive or unresponsive, and sometimes both, depending which part of the screen has to be touched.
Most people seem to take about two minutes to buy a ticket, with the result that queues can build up, and so one needs to allow ten minutes to get a ticket. When one considers that the government is willing to spend billions on a high speed, just to save a few minutes on a long journey, it makes no sense to force passengers to waste their time queuing to buy tickets.
Without making major changes to the software, an immediate improvement could be made if the station names could be typed from the keyboard used to enter the credit card PIN number, as on a mobile phone.
But frankly the machines are dreadful. I can buy a ticket from Uppsala to Stockholm in 15 seconds. The procedure there is
- swipe debit card
- select ticket type from one of a few buttons
- key in the two-digit destination code (choice of up to 100)
- wait 5 secs for ticket to be printed.
Of course it would be even quicker if the ticket machines were on the trains.
I gather from other sources that the problem is partly due to the regulatory authorities who set the standards. We should not have to put up with this bad technology. And why are complaints simply ignored?
More land value the taxpayer will not get back
The East London Line extension has now opened with this fleet of new trains. It is an excellent scheme created mostly on alignments where the trains stopped running long ago. With further extensions it will eventually link Highbury with various destinations in south and south-east London. There are many journeys that people will now be able to make faster and more easily.
Of course this will have a significant effect on rents and property prices, and so yet again we shall see public investment creating land value which will end up in private pockets. No wonder the Treasury is tight-fisted about spending money on railway improvements.
28 Apr 2010
After Tornado - yet nother new steam locomotive?
More East Coast Magic.60163 Tornado, originally uploaded by FlyingScotsman4472.
The Tornado Trust has done, and does, a great job, and today I received a letter from the Chairman to the covenanters about a proposal to build a replica P2 locomotive.
The thinking behind this is that the expertise developed by the Trust should be directed towards further construction. This sounds like a good strategy. However, there are many possible options and in my view, at this stage a feasibility study should consider at least a few of the alternatives. In addition to a straight replica of the 1930s design, some of the obvious ones include
- a small production run of tank locomotives, suitable for use for the actual traffic on preserved railways round the country. This struck me recently when travelling on Gloucestershire and Warwickshire Railway, where a 9F was used for to haul five mark one coaches at a top speed of 25 mph. Whilst it is nice to see a 9F in action, this is extravagant and does not present the impression of a steam locomotive working hard. A small tank locomotive would have been appropriate for the task.
- one or more examples of David Wardale’s updating of the British Railways class 5, the so-called 5AT, which, due to its greater efficiency, should be the equal of a class 8.
- one or more examples of the locomotive designed by Roger Waller of DLM for the Hauenstein line between Sissach and Olten. This is a 4-8-4 tank locomotive but could equally well be a 4-8-0 tender locomotive. This can be adapted for the British loading gauge and can be finished off in any desired style, such as a Gresley streamlined casing.
- an updating of the P2 based on Porta principles of improved combustion and draughting, with other efficiency and labour-saving devices
- A “carbon neutral” steam locomotive using fuel from a renewable source or waste material
Also, looking a decade ahead, the main lines are likely to be increasingly congested and it may be difficult to provide the opportunities for these locomotives to do what they were designed to do.
On the other hand, steam technology is far from dead. Roger Waller has demonstrated that conventional steam locomotives can operate competitively within the modern railway environment. The rebuilt Kriegslok has been used both for steam specials, commuter trains and on hire to the Swiss Railways (SBB) for infrastructure duties, a task for which it proved popular, especially in residential areas! This shows that an appropriate steam locomotive can not only cater for the enthusiast and leisure market, but also earn its keep in mainstream use on the regular railway.
In conclusion, it seems to me that
- there are about half-a-dozen obvious and possible options that need to be considered, and
- it would also be a good thing to see the Trust promoting steam by applying some of the many technical improvements that have been made with the technology over the past forty years.
24 Apr 2010
Getting on and off the train
Getting on an off trains these days is still not always as easy as it might be. If the station platform is at the correct height (915mm) and on a straight stretch of line, there is not usually a problem. Otherwise there can be difficulties, which vary according to the type of stock and the configuration of the platform, especially whether it is concave or convex.
This exhaustive study by the Department of Transport discusses the issue in detail.
22 Apr 2010
Crashworthiness

Southall rail crash - reproduced from the London Emergency Services Liaison Panel (LESLP) Website [1], which states: You may use the information and pictures contained herein for educational purposes in a non-profit making and non-commercial environment.
A letter in the latest issue of Rail questioned the crashworthiness of mark 3 stock. The most serious example of failure of this type of stock is the incident at Southall in 1997 (above), where a signal passed at danger resulted in an HST travelling at high speed receiving an impact from a freight locomotive, with 7 fatalities. But is there any stock would have performed any better in such an event? As in any accident, there is always an element of luck, and the circumstances at Southall were a very particular and unfortunate combination; they are analysed in detail in this informative video.
One aspect of crashworthiness is the strength of the bodyshell structure, and despite Southall, mark 3 stock may be as good as it gets. The subject is discussed at length in Whole Train Dynamic Behaviour in Collisions and Improving Crashworthiness, publication TS118, issued by the Rail Safety and Standards Board in 2006. This is of course not the last word on the subject, but tellingly, the author of TS118, Dr Gordon Taylor, states that "It should be noted that none of the standards, either UK or European, comment on the desired crashworthiness performance of a vehicle once the dedicated crashworthiness features have been overwhelmed. For example, it may be useful to provide guidance on the preferred mode of structural collapse."
It is argued that a shortcoming of mark 3 stock is the lack of collapse zones at the ends of the vehicles, to enable the controlled absorption of energy in the event of end-on collisions. But how much value would collapse zones have been at Southall?
The concept of collapse zones came to notice following a the serious accident at Clapham Junction in 1988, involving trains formed of mark1 stock and resulting in 35 fatalities. Previously, this stock had been regarded as providing a good standard of protection, but expectations had risen in the 40 years since it was designed. TS118 notes that "Following the collision at Clapham in 1988, it was required, as an interim measure, that all new vehicles be designed to absorb 1MJ in a collapse zone at each vehicle end. Subsequently, theoretical calculations were undertaken in which impacts between commuter trains of varying length were undertaken. These showed that, for two such trains each comprising 35 tonne vehicles, the collapse zone energy absorption requirement for a 60km/h head-on collision was 1.5MJ for the impacting end and 0.75MJ for each intermediate end. Collapse zones of 1m at the impacting end and 0.5m at each intermediate end and a peak collapse force of 3MN were also specified as being readily and economically achievable."
Steel versus aluminium
During the last 20 years, large numbers of vehicles have been introduced with bodyshells manufactured from aluminium alloy extrusions. Structural assessments comprising quasi-static crush tests, behaviour in accidents and mathematical modelling have been undertaken to allow comparisons with low carbon steel bodyshells to be made. The principal conclusions were:
- Vehicles built from long aluminium alloy extrusions are generally able to sustain higher loads before collapsing than equivalent steel vehicles. This results in higher decelerations when aluminium vehicles collide.
- Typical aluminium alloy extrusions tend to be thicker and stiffer than equivalent fabricated steel sections and hence are more prone to fail by tearing rather than bending, with the result that less energy is absorbed.
- Welding of alloys typically used for aluminium vehicles (6000 series alloys) significantly reduces the tensile strength relative to the unwelded alloy. This concentrates all the structural deformation in the weaker heat affected zone of member joints, producing the effect of low ductility.
In terms of resulting passenger casualties, a study undertaken in 2000 following the collision at Ladbroke Grove, concluded that there was little difference in the crashworthy performance of modern steel and aluminium alloy vehicles. The same study also concluded that there remained a number of improvements that could further enhance the performance of aluminium alloy vehicles.
Causes of fatalities
There are four principal causes of injury in rail accidents, being
- ejection from the vehicle,
- penetration of crash debris into the vehicle,
- crush of the passenger survival space, and
- impact of the vehicle occupants with internal fixtures and fittings (termed secondary impact).
Of the 162 fatalities recorded during the period 1984-2005, 89% were as a result of crush, penetration or ejection. These categories also accounted for 32% of serious injuries, but just 3.5% of minor injuries. Hence the majority of both minor (96.5%) and major (68%) injuries were attributable to secondary impacts. During the 1973-1983 period, 99% of the 67 recorded fatalities, and 56% of the serious injuries, were attributed to loss of survival space or ejection.
Most fatalities over the two periods for which data is available can therefore be attributed to loss of survival space of one form or another. However, the data show a reduction in the number of fatalities and serious injuries attributable to loss of survival space between the two periods. This is most likely due to the reduced number of accidents involving Mark 1 rolling stock in the latter period... the data therefore demonstrate that phasing-out of Mark 1 rolling stock has coincided with a reduction in the number of fatalities resulting from loss of survival space. However, the loss of survival space remains the principal cause of fatalities on the UK network, as well as accounting for a significant proportion of the major injuries.
The data for the two periods also indicates a clear trend towards ejection as a major cause of fatalities or serious injury. Since ejection is usually the result of trains coming out of line during an accident, this indicates that there is benefit in improving the stability of trains in end-on collisions. This also supports other efforts to reduce the likelihood of passenger ejection such as the strengthening of windows.
...in the same period the number of casualties per accident is actually greatest for side-on impacts. This may be reasoned by considering that in the event of a side-on collision the primary crashworthiness features of the vehicles are bypassed, and there is much less survival space protection.
Discussion
The study from which the above extracts are drawn can be regarded as close to exhaustive. Amongst the conclusions that can be drawn are that
- the entire issue must remain under review in the light of ongoing experience
- since the advent of mark 3 stock, safety has been brought towards a plateau, since accidents are of their nature unpredictable and that designing for one set of conditions can mean that performance in other circumstances is sub-optimal.
- the change from steel to aluminium construction in recent years has introduced a new set of problems, and there are other risks unrelated to crashworthiness, including fire.
- collapse zones can only dissipate a fraction of the energy involved in a high-speed incident and can themselves become a hazard unless passengers are excluded from those areas of the vehicle
- there are many types of possible incidents in addition to end-on collisions and as safety standards improve, it becomes increasingly difficult to design in anticipation of a variety of events of low probability
- if the compliance costs of safety regulations place an unnecessary burden on the the railway, people will transfer to cheaper, less safe modes of transport, making the safety measures counter-productive.
It could reasonably be argued that the performance of mark 3 stock as currently operating could be accepted as providing a performance standard for the crashworthiness of future rolling stock.
Accidents involving mark 3 stock since 1997
1999 Ladbroke Grove (7 fatalities in mark 3 vehicle)
2004 Ufton Nervet (7 fatalities)
Accidents 1967-1997
| Date | Location | Nature of accident | ATP-preventable? | Rolling stock | Fatalities |
| 19.9.97 | Southall | Train collision | —1 | Post-Mark 1 | 7 |
| 8.8.96 | Watford Junction | Train collision | Yes: SPAD2 | Post-Mark 1 | 1 |
| 8.3.96 | Rickerscote | Derailment, then collision | No | Non-passenger | 1 |
| 31.1.95 | Ais Gill | Derailment, then collision | No | Post-Mark 1 | 1 |
| 15.10.94 | Cowden | Train collision | Yes: SPAD | Mark 1 | 5 |
| 25.6.94 | Branchton | Derailment | No | Mark 1 | 2 |
| 27.7.91 | Newton | Train collision | Yes: SPAD | Mark 1 | 4 |
| 8.1.91 | Cannon Street | Buffer stop collision | Yes: Overrun | Mark 1 | 2 |
| 4.8.90 | Stafford | Train collision | No | Post-Mark 1 | 1 |
| 20.4.89 | Holton Heath | Train collision | No | Non-passenger | 1 |
| 6.3.89 | Bellgrove Junction | Train collision | Yes: SPAD | Mark 1 | 2 |
| 4.3.89 | Purley | Train collision | Yes: SPAD | Mark 1 | 5 |
| 12.12.88 | Clapham Junction | Train collision | No | Mark 1 | 35 |
| 11.11.88 | St Helens | Derailment | No | Post-Mark 1 | 1 |
| 19.9.86 | Colwich | Train collision | Yes: SPAD | Post-Mark 1 | 1 |
| 11.9.86 | Bridgeton Depot | Train collision | No | Mark 1 | 2 |
| 27.4.86 | Micheldever | Train collision | No | Non-passenger | 1 |
| 9.3.86 | Chinley | Train collision | No | Post-Mark 1 | 1 |
| 4.12.84 | Eccles | Train collision | Yes: SPAD | Post-Mark 1 | 3 |
| 3.12.84 | Longsight | Train collision | No | Mark 1 | 1 |
| 11.10.84 | Wembley Central | Train collision | Yes: SPAD | Post-Mark 1 | 3 |
| 30.7.84 | Polmont | Derailment | No | Post-Mark 1 | 13 |
| 3.2.84 | Wigan | Train collision | No | Non-passenger | 2 |
| 9.12.83 | Wrawby Junction | Train collision | No | Mark 1 | 1 |
| 3.2.83 | Elgin | Derailment | No | Post-Mark 1 | 1 |
| 9.12.82 | Linslade | Derailment | No | Mark 1 | 1 |
| 11.12.81 | Seer Green | Train collision | No | Mark 1 | 4 |
| 8.12.81 | Ulleskelf | Derailment | No | Post-Mark 1 | 1 |
| 7.11.80 | Crewe | Train collision | Yes: Excess speed | Non-passenger | 2 |
| 14.3.80 | Appledore | Derailment | Yes: Excess speed | Mark 1 | 1 |
| 22.10.79 | Invergowrie | Train collision | Yes: SPAD | Mark 1 | 5 |
| 16.4.79 | Paisley Gilmour St | Train collision | Yes: SPAD | Mark 1 | 7 |
| 25.2.79 | Fratton | Train collision | No | Mark 1 | 1 |
| 19.12.78 | Hassocks-Brighton | Train collision | Yes: SPAD | Mark 1 | 3 |
| 5.9.77 | Farnley Junction | Train collision | No | Mark 1 | 2 |
| 3.1.76 | Worcester Tunnel Jc | Train collision | No | Non-passenger | 2 |
| 26.10.75 | Lunan Bay | Train collision | Yes: Excess speed | Post-Mark 1 | 1 |
| 6.6.75 | Nuneaton | Derailment | Yes: Excess speed | Mark 1 | 6 |
| 23.1.75 | Watford Junction | Derailment, then collision | No | Post-Mark 1 | 1 |
| 23.10.74 | Bridgwater | Train collision | No | Non-passenger | 1 |
| 11.6.74 | Pollokshields E Jc | Train collision | Yes: SPAD | Mark 1 | 1 |
| 19.12.73 | West Ealing | Derailment | No | Mark 1 | 10 |
| 30.8.73 | Shields Junction | Train collision | Yes: SPAD | Mark 1 | 5 |
| 27.4.73 | Kidsgrove | Train collision | Yes: SPAD | Non-passenger | 1 |
| 6.9.72 | Leicester | Train collision | No | Non-passenger | 1 |
| 11.6.72 | Eltham Well Hall | Derailment | Yes: Excess speed | Mark 1 | 6 |
| 16.12.71 | Nottingham | Train collision | Yes: SPAD | Non-passenger | 3 |
| 6.10.71 | Beattock | Train collision | No | Non-passenger | 1 |
| 2.7.71 | Tattenhall Jc | Derailment | No | Mark 1 | 2 |
| 26.2.71 | Sheerness | Buffer stop collision | Yes: Overrun | Mark 1 | 1 |
| 20.5.70 | Guide bridge | Derailment | No | Mark 1 | 2 |
| 31.12.69 | Roade Junction | Derailment, then collision | No | Post-Mark 1 | 1 |
| 18.5.69 | Beattock | Train collision | No | Mark 1 | 1 |
| 7.5.69 | Morpeth | Derailment | Yes: Excess speed | Mark 1 | 6 |
| 8.4.69 | Monmore Green | Train collision | Yes: SPAD | Post-Mark 1 | 2 |
| 8.3.69 | Ashchurch | Derailment, then collision | Yes: Excess speed | Mark 1 | 2 |
| 4.1.69 | Paddock Wd—Marden | Train collision | Yes: SPAD | Mark 1 | 4 |
| 9.9.68 | Castlecary | Train collision | No | Mark 1 | 2 |
| 5.11.67 | Hither Green | Derailment | No | Mark 1 | 49 |
| 27.9.67 | Didcot | Derailment | Yes: Excess speed | Mark 1 | 1 |
| 31.7.67 | Thirsk | Derailment, then collision | No | Mark 1 | 7 |
| 5.3.67 | Connington South | Derailment | No | Mark 1 | 5 |
| 28.2.67 | Stechford | Train collision | No | Mark 1 | 9 |
Source: Memorandum by University of London Centre for Transport Studies (RS 24):
TRENDS IN TRAIN ACCIDENTS ON BRITAIN'S MAIN LINE RAILWAYS (Andrew W Evans LT Professor of Transport Safety, University College and Imperial College London June 1998)