10 Nov 2010

What a horrible design


F SNCF 72571 Manosque 31-07-2009 , originally uploaded by peters452002.
This really looks a mess. The trouble is that there are two different aesthetics in conflict with each other. Or has the cover fallen off the gubbins? If it hasn't, then it is pointless giving the train a sexy front end.

These trains below, with simple, functional front ends, have exactly the same coupling so there is no necessity for the thing to look so awful.

St Leonards Warrior Square station

SJ train at Ängelholm

9 Nov 2010

Rail operators must pay for new carriages - report

Rail operators will have to rely less on subsidies to increase train capacity and the transport department should require new operators to provide enough carriages for passengers, a report by the British Public Accounts Committee said on yesterday.

The problem is a combination of a shortage of carriages, poor seating capacity in the carriages themselves, and short platforms in some stations, which prevents the running of longer trains.

The troubles go back a long way. One of them is that the rolling stock itself is too expensive. A mark 1 coach cost about £5000 in the 1950s. That is about £200,000 in present-day money. But a new hauled vehicle cannot now be purchased for less than £600,000, and self-powered electric or diesel multiple unit (EMU/DMU) vehicles cost at least twice that amount. And in the 1950s - and right up to the late 1980s, EMUs were usually powered with recycled the electrical equipment which was very robust and was often decades old already. Such recycling is unheard-of today.

Of course in the 1950s, train speeds were much lower and modern equipment is more energy-efficient, and there are safety issues as well, all of which have driven up the cost. Air conditioning has come to be expected as a standard fitment, and toilets that discharge onto the track are considered unacceptable.

Nevertheless, there has been waste on a gigantic scale. For example, the electrical equipment and many other components in the 1300 or so mark 1 EMU fleet could have been recycled into new vehicles, as the same equipment continues to give good service on a substantial proportion of the fleet and is likely to remain in use for another 20 years or so. Indeed, the mark 1 fleet itself, despite its age, was perfectly acceptable for use on secondary routes and superior to the slightly newer stock now running on those lines.

The spread of fixed-formation trains also contributes to the shortage, as it is not possible to add extra vehicles kept on standby.

Where do we go from here? There is a need
  • to shift to locomotive-haulage, which is more economic when trains are five cars long or more and allows vehicles to be added or removed in response to demand.
  • for vehicles which can have a variety of seating layouts without compromising comfort unduly - which rules out the customary 1:3/2:3 door configuration.
  • an effective platform-detection system which can be fitted to all stock, so that long trains can stop as stations with short platforms without the risk that passengers will step off into oblivion.
  • to evaluate the systems fitted to vehicles on a value-for-money basis. This applies to features such as air-conditioning, fault-detection systems, at-seat power supplies, and all the other expensive things that fall into the category of nice-to-have.
  • to establish what are the optimum trains speeds on a value-for-money basis.
Once the specifications are cut down to prioritise capacity and basic comfort, there will be a better chance of curing the present troubles.

8 Nov 2010

Missed tram - missed opportunity


Mini-Tram Brighton, originally uploaded by david.sewell46.

This mini-tram was on trial in Brighton in 1994. An example of the Parry Peoplemover, it came to nothing and the streets are still choked with cars.

3 Oct 2010

Ex London buses being shipped to Ceylon in the 1950s


After the war London Transport ordered a new fleet of buses, mostly with AEC engines but some with Leyland also. The latter being non-standard, even though there were more than 1600 of them, they were quickly disposed of. They were apparently not popular with the drivers but one would have thought that a programme of modifications would have sorted out the problems.

What a waste though, when there was a surplus and then the trolleybuses were to be replaced which was another waste and a mistake as well. And for that matter the previous tram replacement programme was also a great mistake but that happened all over Britain.

Why the British tramway operators never bought new standard fleets from the continental manufacturers is an interesting question, the answer to which would probably not reflect well on those responsible for this failure in policy.

19 Sept 2010

Southern Railway to axe toilets from new train fleet

This headline from the BBC web site is not quite right, as the trains in question are not new but in fact some of the oldest in Britain, dating from 1976. Originally used for local services in London, they are being transferred for South Coast routes, including Brighton to Portsmouth, a ninety minute trip. The trains have no toilets, which is unacceptable but people will just have to accept it.

This is another one of the indications that Britain is turning into a third world country. At one time there were toilets on the stations, but these got vandalised and were closed. There were few complaints as there were toilets on the trains at that time. Putting toiletless trains on a ninety minute run is probably going to cause the train company more trouble than they bargained for as desperate passengers are going to use the gangways between the carriages to satisfy the call of nature.

These use of stock is stupid, because there are trains used on short journeys in the London area, with toilets which are locked permanently out of use. These are the class 456 sets, operated by Southern itself. A bit of judicious shuffling of the fleet would largely solve the problem. If it was not that the railways were so fragmented and new stock is of so many incompatible types, it would also have been possible to shuffle to units around so that trains with toilets, presently used on South West Trains services could be used on the Brighton to Portsmouth run. An alternative would be to transfer the Brighton to Portsmouth service from Southern to South-West trains, as they have more suitable stock.
Story on BBC web site

18 Sept 2010

Solar flare threat to transport system

A conference next week will discuss the threat from electromagnetic storms from the sun, which could paralyse high-tech infrastructure. The last such storm was in 1859, and blocked telegraph communication, then in its infancy. But the low-technology systems then in use were little affected.

Electromagnetic storms are caused by solar flares but similar damage can be caused by electromagnetic pulses from nuclear explosions. Most affected will be - it is only a matter of time before this happens - extended power lines such as the electricity grid, and satellites and the systems that depend on them, including GPS. But the disruption could potentially be far more widespread, as heavy current surges in the grid would damage switchgear and transformers, and it could take years to get everything back into service.

The most vulnerable services are the pumps that keep the water supply and sewage systems running. Failure would quickly lead to flooding, contamination and outbreaks of disease. Electrical transport systems would come to a standstill, with the failure of both traction supplies and signalling.

The question that must be asked is whether we have made ourselves too dependent on high technology and what can be done to reduce our vulnerability?

15 Sept 2010

Swedish train accident on Sunday evening

This accident, with one fatality, appears to have involved a train and a heavy construction vehicle. The exact cause remains to be discovered. According to one report, the train was going too fast past a site where repairs were in progress. However, a union commentator has been critical of the practice whereby work is successively sub-contracted to the point that those actually doing the work are unaware of the correct safe working practices. Does that sound familiar?

In the UK, track maintenance these days is usually done with a complete line possession, the trains being diverted or replaced by buses. Despite all the complaints this leads to, perhaps there is more to be said for the practice.