30 Nov 2010
The HS2 Action Alliance
The principal focus for opposition to HS2 is the HS2 Action Alliance (see link on right). Naturally, the opposition has arisen amongst those who stand to be worst affected, which is people in the areas of the Chilterns through which the line passes. However, having a vested interest in something does not invalidate an argument. The more the economic case is considered, the worse it seems. One wonders why HS2 has survived the cuts.
Selective door operation
An effective standard system of Selective Door Operation (SDO) must be one of the keys to increasing capacity on the railways. The lengthening of station platforms to accommodate longer trains can be prohibitively expensive at some locations and is unnecessary at others.
The solution is to fit every door on every train with a detector linked in to the door-actuating circuit, to prevent it from being opened unless there is a station platform alongside. It might take the form of a light and photocell on the train, with the face of the platform being fitted with a strip of reflective material like that on car number plates. Or it could use some kind of sonic or infra-red device - the principle is the same. In the long run this would be a good investment as all trains could stop at all stations. It would be fail-safe, automatic and do away with the complexities of GPS location finding, which requires the train to "know" where it is.
The solution is to fit every door on every train with a detector linked in to the door-actuating circuit, to prevent it from being opened unless there is a station platform alongside. It might take the form of a light and photocell on the train, with the face of the platform being fitted with a strip of reflective material like that on car number plates. Or it could use some kind of sonic or infra-red device - the principle is the same. In the long run this would be a good investment as all trains could stop at all stations. It would be fail-safe, automatic and do away with the complexities of GPS location finding, which requires the train to "know" where it is.
Alternatives to HS2 - official
Last year, the Department for Transport commissioned consultants W S Atkins to consider alternatives to HS2. Referred to as the High Speed 2 Strategic Alternatives Study, it comprises four separate reports. It looks at a range of road and rail interventions between London and the West Midlands, which could effectively increase passenger capacity in line with forecast demand. The documents are available for downloading here.
The Rail Interventions Report concentrates on upgrades to the West Coast Main Line and the Chilterns route to Birmingham and in case of the latter, an interesting list of interventions are postulated. Amongst the options discussed is the possibility of running much longer trains on the WCML. But this is dismissed in the following sentence:
"However, operating a fleet of 400 metre would require platforms at every station served by WCML “fast” services to be lengthened. Selective Door Opening (“SDO”) is unlikely to prove acceptable or workable."
This curt dismissal of a major policy option is strange because what is called for is better SDO systm. Probably this would incorporate a detector system linked into the door opening mechanism. Such a device could be fitted to every door on the train, to ensure that the door could not be opened unless there was a platform alongside. Obviously it would take quite a lot of development work but calls for nothing that existing technology could not solve.
The report dealing with rail interventions mentions in passing that "HS2 Ltd have been tasked by DfT to test the cost and capacity of an entirely new conventional route between London – West Midlands ." I would like to get a look at that report.
The Rail Interventions Report concentrates on upgrades to the West Coast Main Line and the Chilterns route to Birmingham and in case of the latter, an interesting list of interventions are postulated. Amongst the options discussed is the possibility of running much longer trains on the WCML. But this is dismissed in the following sentence:
"However, operating a fleet of 400 metre would require platforms at every station served by WCML “fast” services to be lengthened. Selective Door Opening (“SDO”) is unlikely to prove acceptable or workable."
This curt dismissal of a major policy option is strange because what is called for is better SDO systm. Probably this would incorporate a detector system linked into the door opening mechanism. Such a device could be fitted to every door on the train, to ensure that the door could not be opened unless there was a platform alongside. Obviously it would take quite a lot of development work but calls for nothing that existing technology could not solve.
The report dealing with rail interventions mentions in passing that "HS2 Ltd have been tasked by DfT to test the cost and capacity of an entirely new conventional route between London – West Midlands ." I would like to get a look at that report.
29 Nov 2010
External costs of road use
I came across this in the Guardian's Comments is Free
The annual external costs of road use in the UK have been estimated as follows...- Air pollution £19.7 bn
- Congestion £17.5 bn
- Accidents £9.4 bn
- Noise £2.6 bn
- Road damage £1.5 bn
- Climate change 0.1 bn
- (Road building not included)
- Total £50.8 bn.
Thus motorists are being subsidised by an amount three times larger than the taxes and duty they pay.
http://www.basden.demon.co.uk/G/facts/road.costs.html
The fate of the BREL International train
This experimental train built in 1986 was one of the more attractive products of British Rail Engineering Ltd. It was eventually sold to the Irish railways and re-gauged.
Most of the vehicles were scrapped in 2009. A couple were brought back to the UK and used for bombing practice. Nice to know that a proper value was put on these assets.
22 Nov 2010
The BT10 bogie

An unsung design classic
The BT10 bogie is fitted to mark 3 Inter City stock, including the HST trailer cars. Introduced in the mid-1970s, some units have now been in service for 35 years. These were amongst the first to be fitted with disc brakes and for several years there were complaints about the smell. But once this had been cured, they proved to be exceptional, giving a smooth and steady ride at high speed on indifferent track. Recent tests have shown them to be superior to more recent designs, as well as being significantly easier on the track.
I was discussing this with a colleague recently who has been involved recently in the maintenance of vehicles fitted with these bogies. Apart from a few minor details, he told me that there are no fundamental weaknesses in the design - such as areas prone to fatigue - and after three decades in service they would have shown up by now.
The elegant simplicity of the concept is revealed in the diagram.