The railways in the Republic of Ireland have for decades kept going with a fleet of rolling stock, mostly locomotive-hauled, composed of a mixture of vehicles ancient and modern. This demonstrates good housekeeping. Major acquisitions were the so-called "Cravens" in the early 1960s, 80 British Rail mark 2 coaches in the 1970s, 132 British Rail mark 3 coaches of British Rail design at the end of the 1980s, and 14 vehicles based on the Eurostar for the Dublin-Belfast service. Then came the 67 mark 4 coaches built by CAF, which entered service on the Dublin-Cork route from 2006.
One might have expected that the replacement and renewal programme in Ireland would have gone at about the same rate as in Britain or elsewhere, with the mark 3 fleet running for at least another 30 years. But then came a huge investment under the Irish Government's Transport 21 Plan, with all the mark 3 fleet being replaced by a large fleet of diesel multiple unit trains for both inter-city and commuter services. The mark 3 stock is now stored ready for scrapping.
The cost of the DMUs is given at just over €2.3 per vehicle, which means that over £250 million has been spent on replacing the mark 3 stock prematurely. The weight of these DMUs is given as an unbelievable 63 tons per vehicle, which must surely be an error since a tilting Voyager is 52 tons and an HST power car weights 70 tons.
What would it have cost to refurbish the stock and purchase a fleet of new diesel-electric locomotives? Allowing a generous £200,000 per vehicle for the refurbishment and £70 million for the purchase of, say, 30 locomotives, a total of just under £100 million, it still sounds as if this modernisation has cost 2.5 times what it needed to have done. If other forms of modern traction had been considered, the cost might have been as low as £60 million. If the weight of these DMU cars really is 63 tons, then these trains are going to use a lot of fuel and wear out a lot of track.
This scheme was of course put in place in when Irish Republic's illusory boom seemed as if it would continue for ever. It now looks like profligacy. If times had been otherwise, prudence would still have ruled. However, with the money gone as a result of the choice of priorities , what has been lost is the opportunity to re-connect large areas of the country to the railway system, including the proposed West Coast Rail Corridor, now stalled.
Nor is that the end of the story. Given the shortage of stock in Britain, one might have thought that someone would have looked seriously into the prospect of acquiring the fleet. Obviously there would have been costs involved in re-gauging, refurbishing and dealing with compatibility problems, but it is hard to believe that these would have been bad value compared with new build.
25 Jan 2010
23 Jan 2010
Mark 3 stock and its derivatives
Most people who have travelled on trains in Britain will be familiar with British Rail's Mark 3 stock as these are the carriages in an Inter City 125 train. They have served the railways well and proved a remarkably good investment. The first came into service in 1972 and over 800 were built for service in the UK and a further 120 for the railways of the Irish Republic before production ceased around 1990. In addition, the design was the basis of many types of electric multiple unit trains as well as the International train illustrated in the masthead of this blog, a commercial venture by British Rail Engineering Ltd.
It is well described in the Wikipedia entry but there is more to be said. The 23 metre long bodyshell is a steel monocoque structure, with reinforcing top-hat sections welded on to 3 mm sheet steel. The horizontal members are welded direct to the sheet steel shell and the vertical ones are joggled to fit over the horizontals. There are substantial box section reinforcement members at floor level. The roof is composed of corrugated sheet steel with reinforcing steel diaphragms. Thus the structure is essentially an inverted-U section. This bodyshell construction combines strength with light weight and has not been improved upon.
At the time they were introduced, the mark 3 vehicles were 3 metres longer than anything else running in Britain. The extra length was accommodated by reducing the external width from the maximum permitted, 2.82 metres, to 2.74 metres. There was no loss in space because the reduction was achieved by eliminating or recessing projections such as door handles, though some alterations to the infrastructure were still needed.
Whilst this was an advanced design for 1972, shortcomings became apparent. The need to joggle the vertical top hat sections was time-consuming in the manufacturing process. This might have been avoided if corrugated sheets had been used for the bodyside, as in these Swedish vehicles built around the same time.
The suburban multiple unit versions were prone to corrosion of the floor and lower bodyside, where large amounts of rusty water could collect. This was possibly due to the lack of air conditioning, leading to condensation, as the inter-city vehicles are hardly affected by corrosion apart from the floors in the toilets.
From the passengers' point of view, mark 3 stock suffers from niggling features. The wrap-round doors are heavy, awkward and eventually had to be fitted with secondary locking, following a series of fatalities. Very few of the vehicles were fitted with power operated doors. The window cills are too high, especially for small children who cannot see out of the train. The bay dimension of 2.1 metres, with eight bays per vehicle, is based on the spacing of first class seats and consequently the more closely spaced seats in the standard class vehicles are misaligned to the windows. A "window" seat may or may not have a window alongside. The seat reservation system does not have this information and some passengers end up with no view out of the train. These issues were addressed with the International train, which had power operated doors and a bay dimension of, probably, 1.90 metres, giving an extra seating bay in each vehicle. This is exactly right if the aim is to optimise capacity and comfort, and was adopted for the Alstom's Adelante diesel train.
However, it is possible to fit 64 seats into a mark 3 vehicle, with all being fully aligned to the bays, plus four seats with no view. The International allows 72 aligned seats (above). In recent refurbishments, some mark 3 vehicles have been fitted with fully aligned seats and have been widely praised, whereas in others, notoriously, First Great Western, as many seats as possible have been crammed into standard class and the result is described as grim.
The future of the mark 3 fleet
Replacements for the Mark 3 stock have now been ordered, in the shape of the Hitachi Super Express train, specified by the Department of Transport. This seems set to be one of the worst investments in the history of Britain's railways, but it will be the subject of other blogs.DfT takes the view that Mark 3 stock is showing its age. That is a meaningless statement. Rail vehicles are like houses, with systems and components that wear out and become obsolescent at different rates. A few components may last longer than the vehicles themselves and should be recovered and re-used. Basic good housekeeping should apply. One does not demolish one’s house because it needs repainting. The main structure of a steel monocoque railway vehicle such as a mark 3 can reasonably be expected to last for 60 years, which means they should continue in service for another 20 or 30 years. The use of old stock is an important means by which the burden of fixed capital costs can be kept down. So far as the passenger environment is concerned, there is little or no perceptible difference between an old vehicle and a new one, since it is comfort, space and presentation that are noticed. There are certain issues with the mark 3 fleet but their life expectancy is sufficient to be worth addressing them.
There is also the matter of the fleet now being disposed of from the Irish Railway system. So far as I am aware, little serious study was done regarding the issue of gauge conversion of these vehicles, which are actually newer than the British fleet, have power-operated doors and would have been a useful and relatively inexpensive addition to the railway’s resources. The DfT appears to have missed another trick here.
DfT argues that re-use of mark 3 fleet will not have the capacity for growth, but the exact opposite is the truth: its retention and augmentation with new compatible vehicles, plus, possibly the Irish fleet, would seem to offer the best possible means of increasing capacity.
Future developments
The mark 3 concept has come to an undeserved dead-end. The International configuration with larger and more closely spaced windows was an excellent one, offering passengers a much improved ambience. Corrugated sheet structures are a sound and well established means of adding strength and stiffness without adding to weight. Stainless steels are now more readily available in suitable grades and their use should lead to greater longevity and reduced maintenance costs. A fleet of vehicles designed on these principles, locomotive-hauled and compatible with the existing mark 3 fleet, would provide enhanced capacity and future flexibility. It would probably look something like this. The DfT should be made to review this matter as soon as possible after the election.
20 Jan 2010
Energy conversion on the railway
Sometimes it is worth considering first principles. All transport systems require the conversion of chemical or atomic or potential energy into mechanical energy. The preferred method of doing this is to carry out the initial conversion at a central location such as a power station. This has been realised since almost the beginning of railways, first with the use of rope traction, then with the atmospheric railways in the 1840s, and eventually with the development of electric traction.
But electric traction means that the railway must be provided with a fixed supply of electricity, usually in the form of an overhead contact cable or conductor rail. This is a mature technology and the preferred option where traffic densities are high and the cost of installation can be justified. On routes where traffic volumes are low, the conversion of chemical energy to mechanical energy must take place in a prime-mover vehicle of some kind. The chemical energy can be converted into electrical energy and stored temporarily in batteries but the energy density is low, though the technology improves all the time. The most energy-dense substances at normal temperatures are hydrocarbons with about 8 carbon atoms per molecule, which is why they are the most desirable of fuels. Biomass in its various forms is of low energy density and large volumes are needed.
Internal and external combustion
Hydrocarbon fuels can conveniently be converted into mechanical energy in an internal combustion machine. In smaller sizes these are mass produced and inexpensive and have the advantage of being compact. Internal combustion gives high efficiency of conversion but the rate of combustion of the fuel must at all times precisely match the output of mechanical power, consequently the machine must be sized for the maximum output. Hybrid devices are possible in which the mismatch between the rate of conversion of chemical energy and the power requirement is evened-out through the use of an energy storage system such as a flywheel or electric battery. Internal combustion machines have a few inherent disadvantages. The fuel must be carefully formulated. They are inherently noisy and give rise to vibration. Combustion is incomplete and results in the production of undesirable products such as particulates and nitrogen oxides. They have low power and low torque when running at low speeds, which means that a power transmission system is needed, adding complexity and reducing efficiency. Larger internal combustion machines are difficult to start, and consequently tend to be left running when not actually in use.
External combustion machines separate the combustion process through the introduction of an intermediate stage in which energy is stored until required for use, usually in the form of a hot compressed gas. This enables better control of the combustion process, with the fuel being fully oxidised, thereby preventing the emission of particulates. The combustion system can be sized to match the energy output requirement, averaged out over an appropriate period. The conversion of heat to mechanical energy then takes place in a separate device, and only this needs to be sized for maximum output. Such machines typically deliver high torque at low speeds, and no transmission system is needed, significantly reducing initial costs, transmission losses and maintenance requirements. In theory, any material that will burn can be used as fuel.
At any point in time, circumstances and the state of the technology will affect the relative advantages of the different options. When investment decisions are being made, it is essential to evaluate all the possibilities.
But electric traction means that the railway must be provided with a fixed supply of electricity, usually in the form of an overhead contact cable or conductor rail. This is a mature technology and the preferred option where traffic densities are high and the cost of installation can be justified. On routes where traffic volumes are low, the conversion of chemical energy to mechanical energy must take place in a prime-mover vehicle of some kind. The chemical energy can be converted into electrical energy and stored temporarily in batteries but the energy density is low, though the technology improves all the time. The most energy-dense substances at normal temperatures are hydrocarbons with about 8 carbon atoms per molecule, which is why they are the most desirable of fuels. Biomass in its various forms is of low energy density and large volumes are needed.
Internal and external combustion
Hydrocarbon fuels can conveniently be converted into mechanical energy in an internal combustion machine. In smaller sizes these are mass produced and inexpensive and have the advantage of being compact. Internal combustion gives high efficiency of conversion but the rate of combustion of the fuel must at all times precisely match the output of mechanical power, consequently the machine must be sized for the maximum output. Hybrid devices are possible in which the mismatch between the rate of conversion of chemical energy and the power requirement is evened-out through the use of an energy storage system such as a flywheel or electric battery. Internal combustion machines have a few inherent disadvantages. The fuel must be carefully formulated. They are inherently noisy and give rise to vibration. Combustion is incomplete and results in the production of undesirable products such as particulates and nitrogen oxides. They have low power and low torque when running at low speeds, which means that a power transmission system is needed, adding complexity and reducing efficiency. Larger internal combustion machines are difficult to start, and consequently tend to be left running when not actually in use.
External combustion machines separate the combustion process through the introduction of an intermediate stage in which energy is stored until required for use, usually in the form of a hot compressed gas. This enables better control of the combustion process, with the fuel being fully oxidised, thereby preventing the emission of particulates. The combustion system can be sized to match the energy output requirement, averaged out over an appropriate period. The conversion of heat to mechanical energy then takes place in a separate device, and only this needs to be sized for maximum output. Such machines typically deliver high torque at low speeds, and no transmission system is needed, significantly reducing initial costs, transmission losses and maintenance requirements. In theory, any material that will burn can be used as fuel.
At any point in time, circumstances and the state of the technology will affect the relative advantages of the different options. When investment decisions are being made, it is essential to evaluate all the possibilities.
19 Jan 2010
Eurostar as it ought to be
In this photograph, a Eurostar train is about to enter the Channel Tunnel. When Eurostar began running in 1996, a new terminal was built at Ashford and many trains called there. This was not particularly useful as connections from Ashford are poor, and when the St Pancras terminal was opened in 2007, the revised timetable cut down the number of trains that stopped at Ashford, so most Eurostar passengers go through London.
But what if Ashford was developed as a hub? If connecting lines were improved, trains could run direct to Brighton, Reading and Peterborough via Cambridge. Many more passengers would then be able to catch a Eurostar service without going in to central London, and an hourly trains to Paris and Brussels would pick up a worthwhile volume of traffic at Ashford.
But that is not all. Train services fanning out from Ashford would provide useful travel opportunities for everyone living in the South-East - not just Eurostar passengers, since they would give good connections between many important centres within the regiion.
Britain's spare main lines
One of the reasons given for building a new high speed line is that there is a shortage of capacity. Yet there are a several main lines that are well below capacity and could be reinstated without too much trouble.
London to Birmingham
The old Great Western route from London to Birmingham branches off the main line to Bristol at Acton, and then runs via High Wycombe and Bicester to Banbury, Leamington and Warwick to Birmingham Snow Hill. This was a shortening of the Great Western's original main line to Birmingham, which diverged from the Bristol line at Didcot and ran to Banbury via Oxford. The line via High Wycombe and Bicester has just been restored to double track. In the past, there was keen competition for traffic on the Great Western and West Coast routes between London and Birmingham, and there remains plenty of spare capacity on the Western route, which is not electrified.
London to Manchester
On this axis the competing routes were the West Coast route via Rugby and the Midland via Derby. The direct Midland route was closed between Matlock and Buxton is closed and used as a footpath and at present, trains between Derby and Manchester have to make a detour via Dore and Totley. At one time, the Midland had four tracks between London and Toton in Nottinghamshire. One pair of tracks was for passenger trains and the other was for slow coal trains. The second route was at a distance from the passenger route. If the spare route has not been built over, this represents potential spare capacity. The Midland is not electrified north of Bedford and there are no firm plans to go ahead with the work.
London to Birmingham
The old Great Western route from London to Birmingham branches off the main line to Bristol at Acton, and then runs via High Wycombe and Bicester to Banbury, Leamington and Warwick to Birmingham Snow Hill. This was a shortening of the Great Western's original main line to Birmingham, which diverged from the Bristol line at Didcot and ran to Banbury via Oxford. The line via High Wycombe and Bicester has just been restored to double track. In the past, there was keen competition for traffic on the Great Western and West Coast routes between London and Birmingham, and there remains plenty of spare capacity on the Western route, which is not electrified.
London to Manchester
On this axis the competing routes were the West Coast route via Rugby and the Midland via Derby. The direct Midland route was closed between Matlock and Buxton is closed and used as a footpath and at present, trains between Derby and Manchester have to make a detour via Dore and Totley. At one time, the Midland had four tracks between London and Toton in Nottinghamshire. One pair of tracks was for passenger trains and the other was for slow coal trains. The second route was at a distance from the passenger route. If the spare route has not been built over, this represents potential spare capacity. The Midland is not electrified north of Bedford and there are no firm plans to go ahead with the work.
The Great Central
This is a spine route running from London via Aylesbury, Rugby, Leicester and Nottingham to Sheffield and Manchester. It has been removed between Aylesbury and Nottingham, apart from a stretch near Loughborough which is run as a museum railway. Much of the line of route remains intact.The Settle and Carlisle
Running north-south on the western flank of the Pennines, in the 1980s this line was threatened with closure. This was successfully opposed. Eventually the line was thoroughly renewed and it is now an important route for freight, providing relief to the main West Coast route from Preston. The line has connections from Leeds in the south. It is not electrified and this has not been proposed.
18 Jan 2010
Bargain basement fares - marketing gimmick
The ultimate yield management tool is the advance-booking bargain basement fare. These are promoted on railways in most European countries but they are nothing but a marketing gimmick. SJ, the Swedish national railway, was offering tickets for 95kr between Stockholm or Gothenberg and Copenhagen. Of course these could be used only on a particular train, sitting in a particular seat.
Last year these tickets were being snapped up as soon as they were available and then auctioned on Ebay. SJ put a stop to it by insisting on identification but the whole concept of bargain basement fares for advance purchase is nonsense.
It is unlikely to induce anyone to travel who would not have made the journey anyway. It encourages people to buy tickets and not make the journey, leaving empty seats. And when people book so far in advance, they may find that they are unable to make the journey when the day finally arrives.
Reasonably priced walk-on fares are what is needed. People will accept some restrictions on peak-time travel. Advance-booking bargain basement fares are of no relevance to most people's travel needs.
Last year these tickets were being snapped up as soon as they were available and then auctioned on Ebay. SJ put a stop to it by insisting on identification but the whole concept of bargain basement fares for advance purchase is nonsense.
It is unlikely to induce anyone to travel who would not have made the journey anyway. It encourages people to buy tickets and not make the journey, leaving empty seats. And when people book so far in advance, they may find that they are unable to make the journey when the day finally arrives.
Reasonably priced walk-on fares are what is needed. People will accept some restrictions on peak-time travel. Advance-booking bargain basement fares are of no relevance to most people's travel needs.
Seat reservation snag
I have almost never sat in the seat that had been reserved for me when I made my booking. There is usually some snag. It may be that there is no space for my luggage behind the seat. It may be that the so-called "window seat" is not a window seat at all but is adjacent to a bit of plastic or a curtain. It may be that the seat is right outside the toilet. Or it may be broken, or the window has steamed up inside the double glazing, or the people in the adjacent seats may be playing their music loud or are just rowdy.
A lot of other passengers seem think to think the same on this train between Cologne and Hamburg. Although more comfortable than a British train, people seem to be constantly changing places, as they find one to their taste and then someone else gets on with the reservation ticket for that seat and they have to move.
Part of the problem is due to bad rolling stock design but it is not necessary to reserve passengers into particular seats on particular trains. At the very most, there is a need to regulate the number of passengers travelling on particular trains at busy times, but there are simpler ways of doing it than by applying a tight reservation system requiring complex computer software.
No shows
Tight reservation systems are in any case wasteful. Some passengers book for journeys they fail to make for one reason or another and the seats they would have occupied go empty. In the aviation industry, these are referred to as "no shows". All that is necessary is to issue tickets for certain trains, allowing say, 10% more tickets than seats, on the safe assumption that not everyone with a ticket will be able to travel.
Subscribe to:
Posts (Atom)